Foundry makes it possible to get the warm look and beautiful colors of cedar without the high maintenance.
Foundry shake siding installation.
Our perfection shingles are clean crisp vertical grains with varied widths for a traditional rustic edge.
Describes how to install them and differences between conventional vinyl siding and vinyl shakes installatio.
Cedar shake siding makes a bold statement with its staggered or split shake look that s reminiscent of authentic cottages along the east coast.
Fasten the panel every 10 inches placing each nail in the center of a nailing slot.
Elevate the curb appeal of any home with a wide variety of shingle shake and stone siding in styles that deliver character and charm.
The use of a house wrap is recommended.
When installing foundry shake or shingle panels the first panel should be installed on the lower left side of the wall locked securely into the starter strip.
Shakes and shingles embodying the true essence of wood.
Crafted from 72 molds cast from genuine cedar and stone our siding has the look and feel of the real thing.
3 determine the location of the first course of siding prior to the installation of the corner assembly.
In order to maintain the windload resistance the wood framing materials shall have a minimum specific gravity of 0 42 and the fasteners for attaching the siding to framing materials shall be corrosion.
The beauty of wood and the strength of vinyl that s easy to install.
Siding shall be installed over plywood or a wood composite solid sheathing not less than 13mm thickness should be used to provide an even base for vinyl siding see astm vsi installation standards.
Choose from our split or staggered shake to demonstrate the extraordinary authenticity of a classy cedar profile.
Split shake shake foundry siding.
The foundry corners are designed to align with the 5 7 or 10 127mm 178mm or 254mm exposure panels.
Foundry brings the best of both together with our specialty siding shake shingle and stone.
The siding expands and contracts with temperature changes and the panels must be free to move.
Once you have determined where the first course is to begin trim the top portion of the assembly at the correct length of the corner.