Using a finishing tool while there is water on the surface increase water cement ratio by working the water back into the concrete instead of letting it evaporate.
Finishing a concrete floor slab.
Dont finish the concrete while there is bleedwater on the surface.
On about 90 of slab on grade placements contractors use laser guided screeds and ride on power trowels.
Let us know what tools you would like to see us cover in the future.
There is very little finishing that is not controlled mechanically any more.
Read other tips on building a high quality slab on grade.
Buy precast cement pads.
Use 500 square feet as the minimum job size.
High end finishes with multiple colors designs stencils or other enhancements can run 15 to 30 per square foot or more depending on the materials.
Thanks to these advances in technology even a classic grey concrete floor will look stunning with the right surface preparation and finishing.
We go over all the necessary steps for your concrete slab to come out perfect.
If this video helped don t forg.
A 1 600 square foot reinforced concrete slab foundation costs 11 680 on average.
This can cause dusting scaling and craze cracking.
In this video we show you how to pour your basic 16 x 12 concrete slab.
In fact today s concrete floors come in a range of stains colors and textures.
For thickened edge slabs add the area of the thickened edge.
3 set the forms for your slab.
Find the straightest lumber 2x4 you can find and place it across the barriers holding the concrete in place or forms.
Modern day concrete floors are fully customizable with a variety of beautiful finishing options to choose from.
Homeadvisor s concrete slab cost calculator gives average installed concrete costs per square foot or size 30x30 24x24 40x60 for garage floors sheds backyard slabs and more.
Estimate the labor price to pour concrete vs.
This object is referred to as a screed board.
Place a 2x4 across the concrete.
Many younger good concrete finishers have spent little time hand screeding concrete floors with straight edges or using walk behind power trowels.
For monolithic slabs there may simply be a turn down edge but for many buildings a spread footing is poured then cmu concrete masonry units commonly called block are layed up to finished floor grade.
The 2x4 should extend at least a foot past the forms in each direction.
In this video we go over the bull float concrete trowel.